{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "Display SARI line Reaches , use linear referencing to display construction information and CCTV areas", "description": "
Sari Line. Alignment is straight line manhole to manhole, some curve data based on plans,. Linear Referenced based on reach 2008 Updates: Reach IVA between 4A-0550 and 4A-0560 modified to not go through building Reach IVB between 4B-0820 and 4B-0830 modified by CAD Drawing Reach IVD between 4D-1200 and 4D-1340 along canal street modified by cad and street alignment Reach IVE entire length based on CAD drawing Reach V entire length based on CAD drawings Note: Linear Referencing has been updated with 2008 alignments 2009 updates Reach IVA modified to follow IEUA manhole locations (8/5/2009) Reach IV modifed below Prado for new alignment (hand drawn based on gps manhole locations 7/2009) linear referencing updated 10/2009<\/SPAN><\/P> 2011 updates: <\/SPAN>2/7 - slight modification of IVB between 4B-0830 and 4B-0840 to coincide with GPS of new manholes<\/SPAN><\/P> <\/P> 3/2017 updates: Reach I, II, and III alignments were updated with data from OCSD<\/SPAN><\/P> <\/P> 5/4/2017 - Nichols Rd new alignment modifications<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>",
"summary": "Display SARI line Reaches , use linear referencing to display construction information and CCTV areas",
"title": "GEO_SAWPA.sari_brineline",
"tags": [
"facility",
"pipe"
],
"type": "",
"typeKeywords": [],
"thumbnail": "",
"url": "",
"minScale": 150000000,
"maxScale": 5000,
"spatialReference": "",
"accessInformation": "",
"licenseInfo": "",
"portalUrl": ""
}