description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>Sari Line. Alignment is straight line manhole to manhole, some curve data based on plans,. Linear Referenced based on reach 2008 Updates: Reach IVA between 4A-0550 and 4A-0560 modified to not go through building Reach IVB between 4B-0820 and 4B-0830 modified by CAD Drawing Reach IVD between 4D-1200 and 4D-1340 along canal street modified by cad and street alignment Reach IVE entire length based on CAD drawing Reach V entire length based on CAD drawings Note: Linear Referencing has been updated with 2008 alignments 2009 updates Reach IVA modified to follow IEUA manhole locations (8/5/2009) Reach IV modifed below Prado for new alignment (hand drawn based on gps manhole locations 7/2009) linear referencing updated 10/2009</SPAN></P><P><SPAN>2011 updates: </SPAN><SPAN>2/7 - slight modification of IVB between 4B-0830 and 4B-0840 to coincide with GPS of new manholes</SPAN></P><P><SPAN /></P><P><SPAN>3/2017 updates: Reach I, II, and III alignments were updated with data from OCSD</SPAN></P><P><SPAN /></P><P><SPAN>5/4/2017 - Nichols Rd new alignment modifications</SPAN></P></DIV></DIV></DIV> |